厦门湖里区养老地产项目概念性规划设计【详细咨询】
【服务流程】初步洽谈签订协议 报告编制提交初稿完善修改排版定稿交付客户
【编制费用】根据项目具体情况(行业类别、投资规模、报告用途等)由双方协商确定
【编制周期】2-7个工作日
【报告用途】立项申请 项目 影响评价节能评估 项目用地申请专业公司,一条龙服务RDQH07SX
【联系】董经理
【在线】458790285(QQ)
【撰写公司】瑞鼎集团
【公司介绍】瑞鼎集团是由策划师、工程师、分析师等行业精英投资组建的新锐工程团队,注册资本1100万元。自成立以来,不断积累,勇于开拓进取,了广大企业客户的认可。
项目名称:年产5.5万吨铝合金杆(棒、板)改扩建项目。项目内容:总投资1500万元,新增一条年生产5000吨铝合金杆生产线。铝杆工艺流程:购进铝液→加工成分→浇铸→液压剪切→校直感应加热→连续轧制→连续淬火→绕杆→成品。主要设备:保温炉、连铸机、校直机、轧机、绕杆机、起重设备、光谱仪、运输车等。
把大众创业万众创新融入发展各领域各环节,鼓励各类主体新技术、新产品、新业态、新,打造发展新引擎。
项目名称:年产150万套家电玻璃系列产品项目。建设主要内容:项目不需新增用地,在原厂址内建设,建筑面积约8.9万平方米,主要建设low-e玻璃、高端面冰箱彩晶玻璃及微波炉、烤箱门玻璃、双面印刷热反射玻璃门等系列产品生产线及综合楼、仓库等配套设施,项目建成后,可年产150万套家电玻璃系列产品。工艺技术:外购原片玻璃为原材料-切割-磨边-清洗-高温印刷-钢化-低温印刷-烘干-检验-成品。主要设备:全自动磨边机、高端清洗机、连续型强制对流钢化炉、切割机、全自动印刷机、恒温恒湿机组等设备。
Project name: coal-fired boiler upgrade project. Construction of the main content: the project to the company the original 5 10 t coal-fired boiler upgraded for 5 to 10 t gas boiler. Transformation contents are: the condensed water recycling instead of reconstruction of purified water system, boiler reduce the system noise, a new gas pipeline system, etc. After the completion of the renovation project, in order to clean energy replacement of traditional coal, natural gas can se 1200 tons of standard coal, thermal efficiency at the same time use increased from 60% to over 60%; And can reduce the emissions of harmful substances, of which 58% less carbon dioxide, nitrogen and sulfur oxide reduced by 99%, 81% less nitrogen oxides, slag and waste water to reduce **, environmental protection benefit is remarkable.
Project name: annular furnace waste heat power generation project. The project content: the total investment of 30 million yuan, the project in the company's original factory workshop and 159 workshop in 273 the construction of a waste heat boiler system, the space between the two workshop for construction waste heat power generation system, water cooling system, water treatment, form a complete set of construction. Technology through the waste heat boiler system at the rear of two annular furnace waste heat recycling, driven by waste heat boiler to produce steam turbine, is converted into electrical energy. The main equipment are: 2 sets of waste heat boiler, 4.5 MW condensing steam turbine 1, 1, 5 MW generator necessary water, electricity, gas, fire control, the automation system.