遵义湄潭县家具产业园项目概念性规划设计【详细咨询】
【服务流程】初步洽谈签订协议 报告编制提交初稿完善修改排版定稿交付客户
【编制费用】根据项目具体情况(行业类别、投资规模、报告用途等)由双方协商确定
【编制周期】2-7个工作日
【报告用途】立项申请 项目 影响评价节能评估 项目用地申请专业公司,一条龙服务RDQH07SX
【联系】董经理
【在线】458790285(QQ)
【撰写公司】瑞鼎集团
【公司介绍】瑞鼎集团是由策划师、工程师、分析师等行业精英投资组建的新锐工程团队,注册资本1100万元。自成立以来,不断积累,勇于开拓进取,了广大企业客户的认可。
项目名称:年产30万吨**细矿粉项目。项目内容:总投资9500万元,总35000平方米,建筑面积31500平方米。工艺流程:外购矿渣—定量给料称计量→胶带输送带→立磨机喂料口→烘干粉磨→长袋脉冲除尘器→空气输送斜槽机→矿渣粉库。主要设备有立磨、长袋除尘器、机等。该项目市场需求量大,发展前景。
本规划提出的预期性指标和产业发展、结构等任务,主要依靠市场主体的自主行为实现。要激发各族参与规划实施、建设祖国的主人翁意识,充分发挥各级、社会各界的积极性、性和创造性,尊重基层精神,汇聚群众的力量和智慧,形成全体群策群力、共建共享的生动局面。
项目名称:年产5万吨无碳环保复写纸项目。建设主要内容:年产5万吨无碳环保复写纸项目,工艺流程:原纸一涂布一烘干一成品一分切一包装一入库。主要装备:配料设备、涂布机、复卷机、分切机、锅炉以及辅助生产设备等。市场前景广阔。
Project name: annual output of 50000 tons of plastic pipe project. Construction of the main content: the project covers an area of 53.25 mu, total construction area of 23000 square meters; Main production workshops, warehouses and other facilities, construction of new 10 production lines, increased to 20 make production lines, production capacity is increased. Annual output of hard polyethylene, PE, PPR pipe (piece) of more than 50000 tons. Technological process: material, ingrent, heating integer - cooling - a levite. Plastic pipes (piece) of corrosion resistance, light weight, high strength, flexible and convenient installation, the cast iron pipe significantly lower engineering cost, are widely used in various water supply and drainage, such as communication, electric power, agricultural irrigation and drainage engineering.
Project name: processing 148000 tons of building limestone rocks in construction project. Construction of the main content: the project covers an area of 9 acres, the main construction workshop, workshop and so on, a total construction area of 660 square meters. Technology: outsourcing construction limestone materials - feed - crushing - roughing. Major equipment: purchase feeding machine, crusher, conveyor belt, screening machine, dust collector equipment. Project construction strictly implement the principle of environmental protection, water conservation and security at the same time, can be in after the completion of the project processing 148000 tons of limestone stone building, it has good prospects for development.